House Development Phase 1

Click the image for a a 100-150kb version (800 by 600)
Photos will arrive with time, keep checking for updates!

16th January 2005

The walls are out and the steelwork is going in!


Standing at the window of the white kitchen looking at the units!


Standing at the end of the studio looking up to the wine store.


Stood at the bottom of the stairs looking at the sofa in the green room.


In the upstairs bedroom looking at the mirror wall and the hall at the top of the stairs.


Looking at the stairs and cupboard above.


In the downstairs loo looking at the sofa in the green room.


__________________________________________________


18th Jan - 29th Jan

Studio Wall
(windows looking down to the Pub)


Inside wall removed for the French doors.


Wall rebuilt with door templates in.


__________________________________________________


29th January 2005

Holes for the new windows and the Portal frame starts to be constructed.


Outside view of the holes for the angled windows.


Angled window holes from the inside


Looking back at the white kitchen and courtyard though the first of the Portal 'A' frames.


Front view of the studio with the stonework coming down to make way for the French doors.


3/4 view of the studio and exterior works.


Distance view to show whole house, rest of the portal frame laying on the lawn.


New Oak window for the utility - external view.


New utility and a kitchen window - interior view.



__________________________________________________


7th February 2005

First new window frames go in. The Portal frame is largly built. The glass arrives.


Angled windows in place and stonework being reconstructed.


Digger excavates steps to French doors.


Distance view of house with 3 ton digger in the car park.


All three sections of the Portal frame in place.


The Ridge beam joining the Portal 'A' Frames.


The fireplace diagram, much 'delibration' used to create! Width is 6 foot.


New Oak French Doors arrive - external view.


Glass arrives for the Windows - Utility and Kitchen.


Glass for the french doors and angled windows.


__________________________________________________


13th February 2005

First new window built in. The fireplace is started. The holes for the french windows are knocked out. Happy Birthday Sis!


Angled windows with stonework complete on one.


Studio side with holes cut for the french doors.


Windows and doors with CLEAR! protective seal applied.


The fireplace constructions starts.


Getting and idea of the look of the fireplace and realising some work is required to stop this looking square!


Standing back in the kitchen looking at the exposed angled windows.



Thanks to the weekends winds, our first 'windfalls' get collected from the garden.



__________________________________________________


16th February

First Glass in!
(Angled windows are completed)


Inside windows in and Roof frame coming out


End wall now finished except stripping and stain of round window.


__________________________________________________


20th February 2005

More windows going in and first fix for all services.


Wall being rebuilt around the french windows and the old windows being lost in the wall!


Sunken area infront of this weeks external work.


New window cavity created for streched kitchen window into Green Room.


Inside of new Utility window and first fix electrics awaiting fuse box (area green sofa used to be).


Looking back to the Kitchen to see full height of the living area as the new ceiling joists. Old door to the Studio loft is still in place.


Outside view of all external work.


__________________________________________________


27th February 2005

First Velux goes in and the Kitchen is ready for plastering. New drainage in.


Velux outside. No progress on the wall this week as it's been snowing and to cold!


Velux window inside view.


Plaster boarded Kitchen, ready for plasterers on monday, old staircase hole filled in.



Hole for new twisting staircase.



__________________________________________________


7th March 2005

Two Months in! The plasterers get the 'rebuilding feeling' spread over the walls, while the living room gets to see more sky.


End wall of the kitchen gets prep'ed for the plaster.


End wall plastered.


Upstairs gets it's makeover as well.


At the weekend we have 2 veluxes in, the weather took a break and the wall if finished!


Inside with the light from the veluxes, woodwork prep'ed for the next velux.


This evening we now have 5 velux windows in!, only 3 to go.